JRC Design worked with City staff to program the trails, determine the most appropriate look for the FUTS system, and identify information critical to maximizing the functionality and enjoyment of the trail. Upon completion of a prototypical hierarchy designed by JRC, the full system was completed through design development, design intent drawings, bid packages and a standards manual for future trail sign implementation and usage guidelines.